Silver Raven recently undertook the rectification of an existing steel pipe that was significantly corroded due to years of service. Works included in house fabrication of a 600mm diameter pipe elbow with a large flange to connect to the existing pipe section. Works were carried out at the bottom of a pump room with access down a narrow ladder. With the narrow corridors and very little working room, Silver Raven had to employ clever tactics to move the 350kg section into place and connect it accurately.

Thank you to HIFAB Services for assisting and providing the expertise required to complete this challenging project with speed and confidence. Please get in touch with Silver Raven if you have any Steel Fabrication, Rectification or Remedial projects.