Silver Raven was engaged by EMC Civil to supply, fabricate and install a temporary galvanised steel aqueduct structure to divert water flows while other works on the Sydenham junction project took place.

16mm plate was custom fit to the concrete. We conducted a survey of the area prior to fabrication. This was a critical stage in the project as the steel was made to fit.

This involved transporting, moving, and installing plates more than 700kg+ each in confined areas. Not an easy task.

Other works for this project included:

  • Supply prefabricated packers, shims, and cleats.
  • Supply, design and install of Webforge grating and access stairs including handrails and balls stanchions.

Silver Raven has the capability and skills available

  • In house steel fabrication workshop packed with
    • Plasma Cutter – CNC
    • MIG, TIG and Stick welders
    • Structural steel, aluminium, titanium.
    • Band saw
    • Sheet metal bender
    • Drill press including magnetic
    • Metal lathes
    • Abrasive blasting and painting
  • In house shop drawings